September 21-22: Concrete Decking Forms
The seatwall flagstone has now been completed and the forms for the cantilever
concrete deck have been built. The deck will be colored 'golden buff', and given
a 'wash finish'.
September 23: Concrete Decking
The crew poured the entire concrete deck today. The concrete was pumped in from
the truck, and hand sculpted/finished. It looks fabulous! The first image
looks North; the second and third look South and West from behind the spa,
respectively; the fourth looks back East toward the spa; and the fifth is the
traditional 'wide shot'.
September 24: Acid Wash
Some decorative stonework around the spa was completed today, and the concrete deck
was acid-washed.