Pine Bluff Backyard Project
2004
[ Home | Previous | Next ]
August 25: Plumbing
Today was spent trenching the two main channels for the pool and spa plumbing. One channel leads
from the skimmer, and the other from the spa. The crew anticipates 1-2 more days to complete the
work.
August 30: Plumbing II
These pictures attempt to follow the basic path of the plumbing. The first pic faces West and shows
the trench leading from where the equipment will go (the near corner of the house) to the gas main.
The next four pics basically face North and show the main pipes leading from the equipment to the pool
and spa. The last pic (at an odd angle) shows the drain pipes at the bottom of the pool. The pool
equipment arrived this afternoon (the large cardboard boxes), and will be installed tomorrow.
August 31: Plumbing Complete!
The pool equipment is fully installed and the plumbing from it to the pool and spa is complete. We
are expecting the electricians to arrive tomorrow, and if the inspection goes smoothly, the shotcrete
should happen on Monday. Our contractor opted for shotcrete based on availability; it is apparently
a bit stronger than gunite, but harder to apply and work with.