September 1: Electrical

The first pic shows the gas and sewer connections by the Southwest corner of the house. The second pic shows the electrical stubs to the pool equipment. The final pic shows the electrical conduit (the grey pipes) running to the pool fixtures. The electrical connections should be completed tomorrow, as well as the installation of the in-house control panel. We are also expecting the City Inspector to come and sign off on the work so the shotcrete can happen next week.

September 2: Inspection

The City Inspector came and signed off on the construction so far. We can move ahead with the shotcrete! He mentioned two items: we will need to place our house number on our house (or garage) before the final inspection, and we need to enclose the main city power line that goes to the house in a plastic sleeve (to prevent electrocution when cleaning the pool).